Domestic sustainable energy for Estonia
TMV Green is currently in the development and feasibility phases of wind park projects, aiming to generate approximately 2000 MW of domestic green energy for Estonia. Additionally, we are exploring solar and energy storage projects with a total capacity of 1000 MW.
The selection of project locations has undergone thorough consideration, accompanied by in-depth technical analyses. By working closely with local people, the municipality, and undergoing a detailed permitting process, we will choose the best locations and turbines for each wind park. In some projects, we collaborate with other developers.
Wind park project and lifetime production in a nutshell:
- Technical analysis and negotiation with landowners: 12-24 months
- Planning and detailed studies in collaboration with municipalities: 18-36 months
- Wind measurements and related studies: 14-18 months
- Construction of wind parks: 18-30 months
- Energy production: 30 - 50 years
Pae Wind Park
Locations: Rapla and Kehtna
8-12 turbines
Lau Wind Park
Location: Rapla and Kehtna
8-15 turbines
Hiie Wind Park
Location: Rapla and Kehtna
8-15 turbines
Planning ongoing more information municipality web pages.
Avispea Wind Park
Location: Väike-Maarja
10-30 turbines
Eipri Wind Park
Location: Väike-Maarja
20-40 turbines
Lääneranna Wind Park
Location: Lääneranna
11-14 turbines
Lungu Wind Park
Location: Türi
14-17 turbines
Hulja Wind Park
Location: Kadrina
12-14 turbines
Aidu-Liiva Wind Park
Location: Lüganuse
8 turbines
Abja Wind Park 1
Location: Mulgi vald
20-24 turbines
Abja Wind Park 2
Location: Mulgi vald
12-14 turbines
Roosna Wind Park 1
Location: Järva
20-23 turbines
Roosna Wind Park 2
Location: Järva
4-5 turbines
Nugeri Wind Park
Location: Viru-Nigula
10-13 turbines
TMV projects in Finland
Operational wind parks (124 MW)
- AP1 Alavieska Saarenkylä 9 x 3,3 MW
- AP2 Alavieska Kytölä 6 x 3,3 MW
- YP1 Ylivieska Pajukoski 9 x 3,3 MW
- SP1 Puutinkangas (Sievi) 8 x 5.6 MW
Windparks in development phase (400 MW)
- YP3 Pajukoski II (Ylivieska) 25 x 5-6.2 MW
- YP4 Hirvineva (Ylivieska) 15 x 5-6.2 MW
- HP1 Rahkola (Haapavesi) 4 x 5-6.2 MW
- NP1 Kukonaho (Nivala) 7 x 5-6.2 MW
- YP2 Tuomiperä (Ylivieska) 7 x 5-6.2 MW