Domestic sustainable energy for Estonia

TMV Green is currently in the development and feasibility phases of wind park projects, aiming to generate approximately 2000 MW of domestic green energy for Estonia. Additionally, we are exploring solar and energy storage projects with a total capacity of 1000 MW.

The selection of project locations has undergone thorough consideration, accompanied by in-depth technical analyses. By working closely with local people, the municipality, and undergoing a detailed permitting process, we will choose the best locations and turbines for each wind park. In some projects, we collaborate with other developers.

 

Wind park project and lifetime production in a nutshell:

  • Technical analysis and negotiation with landowners: 12-24 months
  • Planning and detailed studies in collaboration with municipalities: 18-36 months
  • Wind measurements and related studies: 14-18 months
  • Construction of wind parks: 18-30 months
  • Energy production: 30 - 50 years
TMV-Green-windpark01

Pae Wind Park

Locations: Rapla and Kehtna
8-12 turbines

TMV-Green-windpark01

Lau Wind Park

Location: Rapla and Kehtna
8-15 turbines

TMV-Green-windpark01

Hiie Wind Park

Location: Rapla and Kehtna
8-15 turbines
Planning ongoing more information municipality web pages.

TMV-Green-windpark01

Avispea Wind Park

Location: Väike-Maarja
10-30 turbines

TMV-Green-windpark01

Eipri Wind Park

Location: Väike-Maarja
20-40 turbines

TMV-Green-windpark01

Lääneranna Wind Park

Location: Lääneranna
11-14 turbines

TMV-Green-windpark01

Lungu Wind Park

Location: Türi
14-17 turbines

TMV-Green-windpark01

Hulja Wind Park

Location: Kadrina
12-14 turbines

TMV-Green-windpark01

Aidu-Liiva Wind Park

Location: Lüganuse
8 turbines

TMV-Green-windpark01

Abja Wind Park 1

Location: Mulgi vald
20-24 turbines

TMV-Green-windpark01

Abja Wind Park 2

Location: Mulgi vald
12-14 turbines

TMV-Green-windpark01

Roosna Wind Park 1

Location: Järva
20-23 turbines

TMV-Green-windpark01

Roosna Wind Park 2

Location: Järva
4-5 turbines

TMV-Green-windpark01

Nugeri Wind Park

Location: Viru-Nigula
10-13 turbines

Project locations map

TMV projects in Finland

Operational wind parks (124 MW)

  • AP1 Alavieska Saarenkylä 9 x 3,3 MW
  • AP2 Alavieska Kytölä 6 x 3,3 MW
  • YP1 Ylivieska Pajukoski 9 x 3,3 MW
  • SP1 Puutinkangas (Sievi) 8 x 5.6 MW

Windparks in development phase (400 MW)

  • YP3 Pajukoski II (Ylivieska) 25 x 5-6.2 MW
  • YP4 Hirvineva (Ylivieska) 15 x 5-6.2 MW
  • HP1 Rahkola (Haapavesi) 4 x 5-6.2 MW
  • NP1 Kukonaho (Nivala)  7 x 5-6.2 MW
  • YP2 Tuomiperä (Ylivieska) 7 x 5-6.2 MW